Contiguous pile walls in the UAE

Closely spaced bored piles form an excavation-retention system, coordinated with the ground conditions and temporary support design.

Discuss your scope ↗
Contiguous pile walls — installation and ground treatment overview

HOW IT WORKS

Installation sequence

01

Set out & install

Set out pile positions and install the wall to the approved design.

02

Excavate in stages

Coordinate excavation lifts with the specified supports and groundwater controls.

03

Inspect & monitor

Review installation records and the specified monitoring results.

APPLICATION & ENGINEERING

Excavation support with closely spaced bored piles

Contiguous piles have small gaps between adjacent piles. They differ from overlapping secant piles; groundwater control and any infill are assessed separately.

TECHNICAL SERVICE GUIDE

Engineering principles & quality control

Contiguous pile walls — system arrangement123
1Closely spaced piles2Gaps between piles3Retaining wall alignment

When to choose this method

Contiguous pile walls retain excavation faces using closely spaced bored piles. Gaps remain between the piles, so the wall does not inherently form a groundwater cutoff. Movement limits and temporary support levels must be assessed together.

Planning the installation

The ground investigation, groundwater conditions and structural requirements inform method selection. Working access, installation sequence and effects on neighbouring structures are reviewed before execution.

Construction control points

  • Set out pile positions and install the wall to the approved design.
  • Coordinate excavation lifts with the specified supports and groundwater controls.
  • Review installation records and the specified monitoring results.

Check pile positions, diameters and verticality, then coordinate excavation stages with supports or anchors. Monitor wall movement and adjacent structures where required.

FROM SITE DATA TO A TECHNICAL PROPOSAL

Define the ground. Plan the solution.

Share the site location, geotechnical report, structural loads or excavation requirements, drawings and target programme. These inputs allow the engineering team to assess method suitability, equipment access, installation sequence and the required verification plan.

Request a technical quotation ↗

FROM OUR PROJECT REGISTER

Companies in our project portfolio.

AUTHORITIES & FREE ZONES

The UAE construction ecosystem.

LET’S START ON SOLID GROUND.

Discuss your scope, site programme and mobilisation requirements directly with our team.

Request a quote →