Cast-in-situ reinforced concrete piles transfer structural loads to suitable bearing strata.

Discuss your scope ↗
Bored piles — installation and ground treatment overview

HOW IT WORKS

Installation sequence

01

Drill & support

Drill with casing or support fluid where required; inspect the bore and clean the base.

02

Reinforce & concrete

Lower the reinforcement cage and place concrete by the approved method, including tremie placement where required.

03

Test & verify

Maintain installation records and complete specified integrity and load tests.

APPLICATION & ENGINEERING

Load transfer through shaft resistance and base bearing

Reinforced concrete shafts transfer loads to the surrounding ground and bearing strata. Bore support, base cleaning and continuous concrete placement are central construction controls.

TECHNICAL SERVICE GUIDE

Engineering principles & quality control

Bored piles — system arrangement123
1Reinforced concrete shaft2Load transfer to ground3Bearing stratum

When to choose this method

Bored piles suit projects that need reinforced concrete foundations transferring structural loads into deeper ground. Diameter, toe level and reinforcement follow the ground investigation and structural design; access and bore stability govern the construction sequence.

Planning the installation

The ground investigation, groundwater conditions and structural requirements inform method selection. Working access, installation sequence and effects on neighbouring structures are reviewed before execution.

Construction control points

  • Drill with casing or support fluid where required; inspect the bore and clean the base.
  • Lower the reinforcement cage and place concrete by the approved method, including tremie placement where required.
  • Maintain installation records and complete specified integrity and load tests.

Review bore logs, base cleanliness, reinforcement position and concrete placement records. Integrity and load tests are selected by the project specification; neither test replaces the other.

Engineering considerations

  • Geotechnical report, groundwater and nearby structures.
  • Approved design, access and working-platform requirements.
  • Installation records, inspection and specified acceptance tests.

FROM SITE DATA TO A TECHNICAL PROPOSAL

Define the ground. Plan the solution.

Share the site location, geotechnical report, structural loads or excavation requirements, drawings and target programme. These inputs allow the engineering team to assess method suitability, equipment access, installation sequence and the required verification plan.

Request a technical quotation ↗

FROM OUR PROJECT REGISTER

Companies in our project portfolio.

AUTHORITIES & FREE ZONES

The UAE construction ecosystem.

LET’S START ON SOLID GROUND.

Discuss your scope, site programme and mobilisation requirements directly with our team.

Request a quote →