Engineering scope
A foundation-piling package with a documented 15.80 m structural pile length measured from cut-off to toe. Reinforcement and level coordination are central to the scope; structural pile length and excavation depth are separate engineering quantities.
A foundation-piling package with a documented 15.80 m structural pile length measured from cut-off to toe. Reinforcement and level coordination are central to the scope; structural pile length and excavation depth are separate engineering quantities.







