PROJECTS FINISHED
Company-reported total; 86 selected records presented
Specialist foundation engineering across the UAE. Explore Al Watad’s piling and shoring capabilities, credentials, drilling fleet and selected completed projects.
Specialist foundation engineering, dedicated plant and project delivery across the UAE.
Company-reported total; 86 selected records presented
Dubai branch established in 2016
Specialist equipment and support plant
Embedded in planning and site delivery
An integrated fleet of heavy machinery, specialist rotary drilling rigs and support plant for piling, shoring and ground improvement projects across the UAE.
Dedicated rotary drilling equipment deployed across demanding construction sites, supported by experienced operators, technical teams and site supervision.
EXPLORE OUR EQUIPMENT PORTFOLIO →

AL WATAD FOUNDATION / PROJECT 3006Wadi Al Safa 5, Dubai, UAE

S00 / layout schedule; S01 / Sections and Details, Rev.0.
ENGINEERING DRAWINGS / NEXT PAGE →Values describe supplied design drawings. Levels, structural lengths and excavation depths are distinct.
AL WATAD FOUNDATION / PROJECT 3027Arjan, Dubai, UAE

S00 / Shoring Layout; S01 / Sections and Details, Rev.0.
ENGINEERING DRAWINGS / NEXT PAGE →Values describe supplied design drawings. Levels, structural lengths and excavation depths are distinct.
AL WATAD FOUNDATION / PROJECT 3355Al Nahda, Sharjah, UAE

Supplied pile reinforcement drawing / detail P9.2 and pile level annotations.
ENGINEERING DRAWINGS / NEXT PAGE →Values describe supplied design drawings. Levels, structural lengths and excavation depths are distinct.
AL WATAD FOUNDATION / PROJECT 3811Al Nahda First, Dubai, UAE

S01 / Piling Schedule and S07 / P3-3 reinforcement detail, Rev.04.
ENGINEERING DRAWINGS / NEXT PAGE →Values describe supplied design drawings. Levels, structural lengths and excavation depths are distinct.
AL WATAD FOUNDATION / PROJECT 3962 / 3963Al Barsha South Fourth, Dubai, UAE / Plot 681-7378

S02 / Shoring Layout, Rev.02, Plot 681-7378. Quantities relate to shoring only.
ENGINEERING DRAWINGS / NEXT PAGE →234 is the shoring schedule only; foundation-pile quantities are separate.
AL WATAD FOUNDATION / PROJECT 4020Al Hebiah Fourth, Dubai, UAE / Plot 682-1305

Supplied Shoring Sections A-A / B-B and Foundations Plan. Section levels use their drawing datum.
ENGINEERING DRAWINGS / NEXT PAGE →Values describe supplied design drawings. Levels, structural lengths and excavation depths are distinct.
AL WATAD FOUNDATION / PROJECT 4019Al Barsha South Third, Dubai, UAE / Plot 673-1092

S00 / Foundations Plan - Pile Layout, Rev.03. No depth inferred from plan symbols.
ENGINEERING DRAWINGS / NEXT PAGE →Values describe supplied design drawings. Levels, structural lengths and excavation depths are distinct.